Close

Level measurement in the raw water basin

Water treatment

Cooling tower basin level measurement
Cooling tower basin level measurement

Process data

Measuring task:
Level measurement
Measuring point:
Open basin
Measuring range up to:
3 m
Medium:
Raw water
Process temperature:
+10 … +30 °C
Process pressure:
0 … 0 bar
Special challenges:
Contaminants and abrasion

Application

The raw water facility, is extracted mostly from rivers, it is conditioned for use in the steam and condensate loops. Reliable level measurement in the raw water basin ensures that there is always an adequate supply of water.

Your benefit

Reliable
Ceramic measuring cell enables reliable measurement
Cost effective
Maintenance-free operation of the measuring point
User friendly
Simple installation and adjustment


Save application

Save this application as a PDF file.

PDF Download

Industry brochure

Level and pressure instrumentation for energy production

Download