Reservoir at the pumped storage power plant
Level measurement at the reservoir
Process data
    Measuring task:
    
    Level measurement
        Measuring point:
    
    Basin, reservoir
        Measuring range up to:
    
    70 m
        Medium:
    
    Water
        Process temperature:
    
    0 … +25 °C
        Process pressure:
    
    0 … 0 bar
        Special challenges:
    
    Wind, weather, temperature changes, ice formation
Application
Pumped storage power plants store a large amount of energy and feed it into the grid very quickly when necessary. One important parameter is the height of the water level in the reservoir. It allows calculations to be made about the amount of energy available and the existing storage volume in pump operation mode. High reliability is required from the measurement technology deployed, because the sensors are often mounted at very remote locations.
                    Your benefit
Reliable
                                Ensures reliable efficient, optimal operation of the hydroelectric plant
                            Cost effective
                                Maintenance-free measurement
                            User friendly
                                Simple installation on existing structures 
                            Recommended products
 
                                            VEGAWELL 52
Hydrostatic level measurement for monitoring the water level in the reservoir
- Robust submersible pressure sensor design ensures high availability
- Wear-free ceramic measuring cell minimizes maintenance costs
- Simple mounting and setup
Measuring range - Pressure
                                                            0 ... 60 bar
                                                            Process temperature
                                                            -20 ... 80 °C
                                                            Process pressure
                                                            -
                                                            Real application example
                                    In a current project, a natural alpine lake is being expanded and converted into a reservoir. The construction site, located at nearly 2,500 meters above sea level, has to be protected against flooding. To accomplish this, the level of the lake is constantly monitored during filling. 
› Read more
                                        
                                    
                                
                            › Read more
 
                             
                                            
Close