Close
email public

Biogas storage facility

Volume and pressure monitoring in the biogas storage facility

Process data

Measuring task:
Level and pressure measurement
Measuring point:
Tank/pipeline
Measuring range up to:
0 … 30 m
Medium:
Gas
Process temperature:
0 … +50 °C
Process pressure:
0 … +10 bar
Special challenges:
Chemical resistance

Application

The methane gas extracted from the digestion tank is temporarily stored in a gas reservoir. Depending on the design of the gas storage facility, either a flexible diaphragm of plastic or a floating roof is used for volume equalization. The gas volume and gas pressure are measured continuously to ensure reliable and safe operation.

Your benefit

Reliable
High measurement certainty without mechanical wear
Cost effective
Optimal information on the available gas quantity
User friendly
Maintenance-free, reliable operation of the facility

Recommended products


Save application

Save this application as a PDF file.

PDF Download